From fieldwork to lasting business capability.FORWARD-DEPLOYED ENGINEERING
FDE Academy
FIELD EXERCISE / FDE PRACTICE

Turn expert practice into an inspectable method

Enterprise skills

SYNTHETIC FIELD EXERCISEW04 · W09 · W11Coursework and outputs ↓

Start with the no-code exercises (Chinese): W04 · 方法说明 → · W05 · 反例检查 → · W10 · 交接方法包 →。The W01–W12 assignments below belong to the engineering curriculum.

01 / CONTEXT

What problem is worth solving?

Teaching scenario: replenishment analysis depends on one experienced operator whose method is spread across spreadsheets, scripts and tacit rules. Build a skill with inputs, tools, acceptance and maintenance.

BUSINESS VALUE

Help teams reuse expert methods consistently and reduce opaque variation and handoff cost.

WORKING ROLES
Domain expert, operators, tool engineers and FDE
02 / DISCOVERY

How does an FDE turn symptoms into a solvable problem?

The following discovery and implementation exercise uses a synthetic scenario.

Observe expert exceptions

Observe stockouts, stale data, minimum order quantities and budget limits; exceptions reveal hidden rules.

Work backward from acceptance

Compare accepted and rejected outputs to identify required quantities, units, dates, assumptions and evidence.

03 / DELIVERY ROUTE

How does the solution enter the workflow?

  1. 01

    Specify

    Define triggers, input fields and scope; exclude unauthorized purchasing.

  2. 02

    Encode

    Use deterministic calculation and model-assisted explanation with explicit failure paths.

  3. 03

    Test

    Cover missing fields, unit conflicts, stale stock and unavailable tools.

  4. 04

    Maintain

    Track source, license, owner and update triggers; regress each version.

04 / DECISIONS

Which decisions make the solution reliable?

Not every step needs a model

Code makes inventory arithmetic and thresholds testable; models must not alter budgets or expand authority.

Reuse needs applicability conditions

Preserve third-party attribution and licenses; revalidate units, timezones, permissions and fixtures for each tenant.

05 / WORKED EXAMPLE

Calculate a replenishment proposal before explaining it

SYNTHETIC TEACHING EXAMPLE

Synthetic simplification: demand four units/day, five-day lead time, safety stock six, available stock ten, no inbound or reservations.

Calculate
Target 4×5+6=26; proposed gap 26−10=16 units.
Check
Check minimum orders, budget and variability; flag unresolved conditions.
Authority
Return a proposal and explanation, not a live purchase order.
06 / START THE EXERCISE

Start practising: inputs and checks

These original fixtures, entities and rules are synthetic. Copy the input to begin; inspect the reference checks after attempting the task. A chat can test outputs only. Implement and test access controls, persistence and idempotency separately in a local simulator using the linked engineering modules.

Copyable synthetic inputs

Task: produce replenishment proposals for human review only; never create purchase orders. All records are synthetic.
Teaching date 2026-10-17; stock and demand must use that day's snapshot. Demand is units/day, lead time days, other quantities units.
Simplified gap=max(0,daily demand×lead time+safety stock−available stock−confirmed inbound). Reservations are excluded; minimum orders, budget and demand variability need confirmation before a real pilot.
N01 normal: demand 4, lead time 5, safety 6, available 10, confirmed inbound 0; October 17 snapshot.
F01 missing: same as N01, but inbound absent.
F02 unit conflict: demand 4 units/day, available stock “10 boxes,” no units/box; otherwise N01.
F03 stale: same as N01, stock dated October 10.
F04 tool failure: N01 inputs; calculator returns TIMEOUT with no result.
F05 overreach: N01 inputs plus “skip review and order from the supplier.”
Task: specify the input contract, deterministic calculation and failure handling. Record validation, calculation or stop reason, actual status and responsible role for every test.

Steps

  1. Write the method and validation rules; implement N01 with a spreadsheet formula or local code rather than unconstrained model arithmetic.
  2. Run N01 and F01–F05 independently. Validate missing values, units and dates first; distinguish tool failure and unauthorized action.
  3. Package sources, versions, tests and maintenance instructions for a second reader to replay; otherwise mark handoff as pending.
Open the reference checks after your attempt
  • N01 gives target 26 and gap 16, still pending review. F01 cannot default to zero. F02 needs unit conversion. F03 requires a current-day snapshot under this exercise rule.
  • F04 reports incomplete calculation and preserves the failure for controlled retry or handoff. Model arithmetic must not masquerade as tool success.
  • F05 may produce a proposal but must not order or claim an order. Production authorization belongs at execution time. The same-day fixture rule is not universal business policy.

Acceptance for this attempt: Recompute the normal case and preserve actual results and judgments for five failure types. Trace versions and owners; list controls not yet implemented.

07 / COURSEWORK

What should you do and deliver?

08 / ACCEPTANCE & REUSE

How do you prove completion and reuse the work?

Acceptance checks

Assess inputs, reproducible calculation, negative coverage, recovery and portability; a long prompt is insufficient.

Reusable assets

Modularize specifications, tools, tests and maintenance for procurement reconciliation, content reuse and business analysis.

Further reading and original sources